Touch the firehose of ds106, the most recent flow of content from all of the blogs syndicated into ds106. As of right now, there have been 92511 posts brought in here going back to December 2010. If you want to be part of the flow, first learn more about ds106. Then, if you are truly ready and up to the task of creating web art, sign up and start doing it.

Pre production – Final stages.

Posted by
|

Tomorrow we are doing our show and I feel like we are not ready at all, the last few days of pre-production have been a nightmare which will have to be changed for our second show. Shara and I ended up working on the same feature without the other knowing which means the group need to communicate more effectively. Also the feature Issy came up with for Christmas was advertising and my Christmas Feature on what Shows were on in Leicester fell through as the marketing team at DMH and the press Team at DMH told me two different things and we were told the interview had been postponed for two weeks just within an hour of the time we had agreed on. Rory’s student Culture feature is based around student meals which works nicely with our replacement feature which is ‘Student tucker trials’ and ‘I’m a celeb’ catch up. Everyone has been trying to fix the audio for Shara’s interview with the square mile team and Rory’s vox’s as they were recorded without Issy and the with the wrong Mic. Also me and Alex (presenters) don’t have our information to write our cues from anyone but Rory.

Me and Alex will continue to write cues in the morning.

 

Add a comment

ds106 in[SPIRE]